Questions to ask
1. Washington requires contractors to register with L&I — what registration number and specialty do you hold, and does it cover every part of my bid?
Why it matters: Washington’s contractor law says every contractor must register with the Department of Labor and Industries (L&I), and it is a gross misdemeanor to advertise, offer to do work, bid, or perform work as a contractor without being registered (RCW 18.27.020). The definition of “contractor” covers anyone who, in an independent business, offers to construct, alter, repair, improve, or move any structure, project, development, or improvement attached to real estate, and it names “performing tree removal services” (RCW 18.27.010). L&I says it regulates 63 specialties that each require registration, including tree removal (L&I: Contractors). Two of those specialties are “Landscaping” — landscape systems, grading plots, topsoil, hydroseeding, planting decorative vegetation, non-load-bearing slabs and walkways of concrete, brick, stone, or gravel, decorative wooden decks, garden walls, fences and screens up to six feet high, and residential lawn sprinklers without pumps, ponds, and water features — and “Irrigation sprinkler systems”; the Landscaping specialty excludes cast-in-place or tilt-up concrete, load-bearing walls, and perimeter fencing along property lines, and Fencing, Masonry, and Excavation, grading and land clearing are separate specialties (WAC 296-200A-016). A contractor’s advertising must show the current registration number and the name as registered (RCW 18.27.100); an unregistered contractor generally can’t sue to collect payment (RCW 18.27.080); and the exemption for very small jobs under a low dollar threshold doesn’t apply to anyone who advertises or puts out a sign or card suggesting they are a contractor (RCW 18.27.090(9)). L&I’s Verify tool searches by name, license, workers’ comp account, or UBI, and L&I says to use it to confirm an active license, bond and insurance, safety violations, and license history (L&I: Verify a contractor) (L&I: Hiring a contractor). OUR READING: a crew that bids planting, sod, irrigation, pavers, walls, or a deck should show you an active registration with a matching specialty; ask which specialty covers a boundary fence, since we found the Landscaping specialty excludes property-line perimeter fencing, and ask whether ongoing maintenance work is covered by the same registration.
2. What bond, liability insurance, and workers’ compensation account are on file for your business, and can I check them myself?
Why it matters: To register, L&I says a contractor must buy a surety bond (or use an assignment of savings) and a general liability policy (L&I: Contractors). The bond must be continuous with the state as obligee, and a cancellation or withdrawal of the surety automatically suspends the registration; anyone with a claim against the contractor may sue the contractor and the bond (RCW 18.27.040). Insurance (or an assigned account) is required at registration and renewal, and expiration or cancellation automatically suspends the registration (RCW 18.27.050). The application must also show workers’ compensation coverage — the applicant’s industrial insurance account number — unless the applicant won’t employ workers in Washington (RCW 18.27.030). L&I says Washington doesn’t allow private workers’ comp: you buy it from L&I or be a certified self-insurer (L&I: Insurance requirements), that a 1099 form has no bearing on workers’ comp coverage, and that having a UBI or contractor registration number does not automatically make a worker an exempt independent contractor (L&I: Independent contractors). Under RCW 51.12.070, the person who lets a contract for work is “responsible primarily and directly” for the premiums on the work, except that a registered contractor is not responsible for a subcontractor’s premiums when listed conditions are met, including that the subcontractor is registered and has an L&I account in good standing (RCW 51.12.070). CONFLICT: L&I’s registration page describes the liability insurance as a public liability amount plus property damage, or a combined single limit (L&I: Contractors), while RCW 18.27.050(1) states property damage, one-person, and multiple-person injury amounts (RCW 18.27.050); we omit the amounts — ask for the certificate and check it against the current statute. OUR READING: we did not find whether RCW 51.12.070 reaches a homeowner who hires a contractor, so don’t rely on it — look up the company’s workers’ comp account in L&I Verify and ask the insurance agent to send certificates directly.
3. Who will install the sprinkler or drip system, the landscape lighting, and any pump or line-voltage wiring — and which license covers each piece?
Why it matters: L&I’s Landscaping specialty includes residential lawn sprinklers “without pumps,” and says Landscaping work may also require an electrical license under chapter 19.28 RCW and/or plumber certification under chapter 18.106 RCW (WAC 296-200A-016). The separate “Irrigation sprinkler systems” specialty covers installing, repairing, and maintaining sprinkler systems; connections to potable water lines and hose bibs are allowed only when they are an integral part of the sprinkler system and outside a building, and pumps that draw or boost pressure on a residential sprinkler system need plumber certification and/or an electrical license (WAC 296-200A-016). Washington’s electrical rules exempt low-voltage circuits for underground landscape sprinkler systems and landscape lighting from electrical licensing and permitting only if the power comes from a listed Class 2 power supply, the line-voltage equipment and conductors supplying the system are installed and terminated by licensed and certified electrical contractors and electricians, and the installation isn’t covered by NEC Article 680 (swimming pools, fountains, and similar installations) (WAC 296-46B-925(8)). Seattle Public Utilities says Public Health – Seattle & King County is the plumbing authority inside Seattle city limits (SPU: Requirements & types of backflow prevention). OUR READING: low-voltage lighting wire can be laid by the landscaper, but the transformer’s line-voltage connection, any pump circuit, and lighting at a pond, fountain, or pool need an electrician; ask who connects the water, who tests it, and who is responsible for each permit. We did not find a Seattle page listing permit rules for irrigation systems, so ask the installer to name the permit authority and give you the permit number.
4. Which backflow assembly will protect my water, who will test it at installation and every year, and who reports it to Seattle Public Utilities?
Why it matters: Seattle Public Utilities (SPU) says any actual or potential cross-connection must be eliminated or properly protected, and it lists irrigation and lawn sprinkler systems and lawn chemical application equipment among common cross-connections (SPU: Backflow prevention & cross-connection control). For low hazards, including irrigation systems, SPU accepts double check valve assemblies (DCVA/DCDA), spill-resistant vacuum breaker assemblies (SVBA), and pressure vacuum breaker assemblies (PVBA); premises with a separate irrigation system on the utility’s water supply with chemical addition are listed as high health hazards requiring a reduced pressure assembly (RPBA/RPDA); SPU’s certified cross-connection control specialists decide what each installation needs; and the assembly must be approved for use in Washington (SPU: Requirements & types of backflow prevention). New assemblies must be inspected at installation and tested by a Washington-certified Backflow Assembly Tester before being put into service, tested again every year and after any repair or replacement, with the report sent to SPU (SPU: Requirements & types of backflow prevention). The tester submits the report directly to SPU; SPU sends reminders, but the water service owner is responsible for on-time testing, and SPU may assess non-compliance charges and possibly terminate water service (SPU: Backflow assembly testing). CONFLICT: the Seattle Residential Code chapter SDCI posts (2021 edition) says the potable supply to lawn irrigation must be protected by an atmospheric vacuum breaker, a pressure vacuum breaker assembly, or a reduced pressure principle assembly, and by a reduced pressure assembly where chemicals are introduced (Seattle Residential Code ch. 29, P2902.5.3 (PDF)) — that list doesn’t include the DCVA or SVBA that SPU’s page accepts. We could not confirm whether SDCI has adopted a newer edition. OUR READING: before buying, ask the installer to name the assembly type and model, who will run the first test, and who confirmed it with SPU and the plumbing authority; keep the test report and calendar the yearly test.
5. If you spray weeds, moss, or insects, what WSDA pesticide license do you hold — and do you hold the state nursery endorsement for installing plants?
Why it matters: The Washington State Department of Agriculture (WSDA) says a landscape company that applies pesticides to customers’ properties must hold a Commercial Applicator license even if it only does moss control, only uses a spreader, backpack sprayer, or hand application, or works part-time (WSDA: Commercial applicators). WSDA’s notice to landscape maintenance companies says pesticides include herbicides, insecticides, fungicides, and moss control agents such as fertilizers with moss control, that employees who apply pesticides must be licensed as Commercial Operators working for a Commercial Applicator, and that each unlicensed application can be considered an incident (WSDA: Landscape maintenance companies fact sheet (PDF)); the statute makes it unlawful to apply pesticides as an applicator’s employee without a commercial operator license (RCW 17.21.110). The applicator license requires passing Laws & Safety plus category exams, proof of financial responsibility, and annual renewal (WSDA: Commercial applicators). CHANGE: WSDA’s pesticide categories changed effective January 1, 2026 to follow federal certification and training rules; relevant categories include Weed Control, Insect and Disease Control (which doesn’t allow perimeter treatments around structures), and the limited Structural and Turf Demossing specialty (WSDA: Pesticide license categories). WSDA’s license search covers licensees who renewed within the last two years (WSDA: Pesticide license search). Separately, WSDA says landscapers and maintenance companies that buy, hold, or grow plants to install, and any business that installs plants for customers, need a nursery plant seller/installer endorsement on their business license (WSDA: Nursery plant seller/installer licensing). OUR READING: ask for the applicator license number and categories before anyone sprays, ask for the nursery endorsement if plants are part of the job, and know that we did not find a public lookup for the nursery endorsement.
6. Does any part of the job involve tree removal, major pruning, or root work — and is the company on Seattle’s tree service provider registry?
Why it matters: SDCI says Seattle Municipal Code 25.11 limits the number, size, and type of trees that may be removed from private property (SDCI: Tree removal). Trees are sorted into tiers by diameter at standard height (DSH): Tier 1 heritage trees; Tier 2 trees 24 inches or larger, groves, and certain species; Tier 3 trees 12 to under 24 inches; and Tier 4 trees 6 to under 12 inches (SDCI Tip 242B (PDF)). Tip 242B (updated October 1, 2025) says removal of Tier 1–4 trees is generally prohibited when no development is proposed, with exemptions and allowances; in most residential zones removal of no more than two Tier 4 trees in any three-year period is allowed without SDCI review, hazard tree removal needs an ISA Basic Tree Risk Assessment and SDCI approval, and emergency removals must be reported with an application within 10 days (SDCI Tip 242B (PDF)). All commercial tree work on private property — removal of any Tier 1–4 tree, “reportable work” (live branches 4 inches or more, live roots 2 inches or more, or 25 percent or more of the foliage-bearing area), and tree health or hazard consulting — must be done by a registered tree service provider; pruning fruit trees and hedge maintenance aren’t reportable work, and grinding an old stump is not commercial tree work (SDCI Tip 242C (PDF)). Registered providers must comply with public notice requirements before reportable work or removal (Seattle Services Portal: Trees), display their registration number on commercial vehicles, and renew yearly (SDCI Tip 242C (PDF)). In the public planting strip, SDOT requires a Street Tree Permit to plant, remove, or do major pruning (cuts of 2 inches or more or 15 percent or more of the canopy), with a registered tree service provider listed for removal and major pruning (SDOT: Street tree permits). Washington also treats tree removal as contractor work under RCW 18.27.010 (RCW 18.27.010). CONFLICT: Tips 242B and 242C cite Director’s Rule 7-2023 for designating Tier 2 species, but SDCI’s trees page lists Director’s Rule 7-2024, “Designation of Tier 2 Trees” (SDCI: Trees & codes); ask SDCI which species list applies to your tree. CHANGE: the tree rules and provider registry are recent (Tip 242C is dated July 31, 2023 and Tip 242B was updated October 1, 2025), so check current SDCI guidance. OUR READING: a bid that includes removal, topping, or heavy limb or root cutting should name the registered provider, the tier of each tree, and the permit or approval number.
7. Does my wall, fence, deck, patio, or grading need a Seattle permit, and who decides?
Why it matters: SDCI says you don’t need a construction permit for a retaining wall or rockery only if all three conditions are met: it’s 4 feet or lower measured from the bottom of the footing to the top of the wall, the parcel has no environmentally critical area (ECA), and you won’t damage adjoining properties or structures — a wall at the property line is the example SDCI gives of where damage may exist; no wall of any height is allowed on an ECA parcel unless specific requirements are met; rockeries need a geotechnical engineer’s design or the prescriptive standards; and a drain behind a wall that connects to a side sewer needs a side sewer permit (SDCI: Retaining walls & rockeries). A fence of 8 feet or less in total height with no masonry or concrete elements over 6 feet needs no permit (a fence in a flood-prone area does); in neighborhood residential zones zoning limits fence height to 6 feet plus 2 feet of architectural features, and to 4 feet in a front or street-side setback; and a fence above a retaining wall that raises grade is limited to 9 feet 6 inches combined (SDCI: Fences). A deck needs a permit if it is more than 18 inches above the ground, is a roof deck, or is in an ECA (SDCI: Decks). A grading permit may be needed for work such as excavating or adding soil above set volumes, disturbing 5,000 square feet or more, or adding or replacing a combined 750 square feet or more of hard surface including pavement (SDCI: Grading permit). Seattle’s noise rules allow construction and maintenance work 7 a.m.–10 p.m. weekdays and 9 a.m.–10 p.m. weekends and legal holidays, shorter evening hours in multifamily and neighborhood commercial zones, and 8 a.m.–5 p.m. weekdays for impact work (SDCI: Noise code). CONFLICT: SDCI’s retaining wall page says walls “4 feet or lower” need no permit, while its grading page says walls “4 feet tall or higher” need a construction permit (SDCI: Grading permit) — a wall at exactly 4 feet is covered by both; ask SDCI. OUR READING: a patio or paver driveway can cross the hard-surface grading threshold even without a wall; ask the contractor which permits they will pull, and check ECA and property-line status first.
8. Will you request a Washington 811 locate before digging, and what about my private sprinkler, lighting, and gas lines?
Why it matters: Washington’s dig law requires an excavator to mark the boundary of the excavation area with white lining or pin flags and notify a one-number locator service not less than two full business days and not more than 10 full business days before the work-to-begin date; the service issues an excavation confirmation code, which is not valid until that date (RCW 19.122.030) (RCW 19.122.020). “Excavation” means any operation in which earth, rock, or other material on or below the ground is moved or displaced by any means (RCW 19.122.020). The statute exempts excavation under 12 inches deep on private noncommercial property only when it is done by the owner or occupant or their employee (RCW 19.122.031). Utility locators mark facility operators’ lines, and the definition of “facility operator” excludes a utility customer who owns a service lateral running to the operator’s main line, so private lines may go unmarked (RCW 19.122.020); Washington811 points to a list of private locators (Washington811). CHANGE: RCW 19.122.030 and .031 were amended by 2025 c 292, so older summaries of the notice rules may be out of date (RCW 19.122.031). OUR READING: hand-digging a planting hole for a paid crew is not covered by the owner exemption; ask for the 811 ticket number, and hire a private locator or mark sprinkler, low-voltage lighting, and any private gas or water lines yourself.
9. If I replace lawn with drought-resistant plants — or the weather turns dry — what do my HOA and Seattle’s water supply rules say?
Why it matters: Washington’s HOA law says an association’s governing documents may not prohibit drought-resistant landscaping, pollinator habitat, or wildfire ignition-resistant landscaping, though they may include reasonable rules on placement and appearance that don’t make it unreasonably costly or effectively infeasible; and if the property is covered by an Ecology drought order, the association may not sanction or fine an owner for reducing or eliminating watering for the duration of the order (RCW 64.38.057). “Drought resistant landscaping” is defined as noninvasive vegetation adapted to arid or dry conditions, stone, or landscaping rock (RCW 64.38.057). CHANGE: Ecology declared a statewide drought emergency on April 8, 2026, the fourth year in a row (Ecology: Statewide drought declared (April 8, 2026)), but SPU said that month it expected enough water for people and fish through summer and wasn’t asking customers to cut back (SPU: Our water supply this spring); SPU’s November 16, 2026 update anticipates sufficient supply this fall and continues to ask customers to use water wisely (SPU: Water supply conditions). We did not confirm whether the statewide order remains in effect. We checked RCW 64.38.057, which applies to associations under chapter 64.38; condominium associations under chapter 64.90 may differ, and we did not find an equivalent section. OUR READING: a Seattle-area HOA can set placement and appearance rules but can’t simply ban a water-wise yard; get any architectural approval in writing before the contractor orders plants, and ask what plan covers establishment watering if restrictions return.
10. Is the contract in writing with the state’s disclosure statement, a clear cancellation right, and a plan for liens?
Why it matters: For work on four or fewer residential units or accessory structures priced at or above a statutory threshold, a contractor must give the customer a written disclosure statement before starting; it states the contractor’s registration and bond, warns that the bond might not cover a claim, says you may withhold a percentage as retainage, warns your property may be liened if suppliers or subcontractors aren’t paid, and says you may ask for lien release documents (RCW 18.27.114). The contractor must keep a signed copy for three years, can’t maintain a lien claim without proving it was provided, and commits an infraction by failing to provide it (RCW 18.27.114). L&I advises getting at least three written bids, references, and a written contract you understand (L&I: Hiring a contractor). Under Washington’s lien law, “improvement” includes grading, filling, and clearing, and planting trees, vines, shrubs, plants, hedges, or lawns, or providing landscaping materials (RCW 60.04.011); anyone furnishing labor, materials, or equipment for the improvement has a lien on it (RCW 60.04.021); suppliers must generally give the owner written notice of the right to claim a lien (RCW 60.04.031); and a claim of lien must be filed within 90 days after the person stops furnishing labor, materials, or equipment (RCW 60.04.091). For cancellation, the FTC’s rule requires a door-to-door seller to give a completed contract copy and notice that you may cancel before midnight of the third business day (16 CFR 429.1), and a door-to-door sale includes a sale at your residence by a seller who personally solicits it, with listed exclusions (16 CFR 429.0); Washington gives a three-day cancellation right (excluding Sundays and holidays) on financed retail installment transactions solicited in person away from the seller’s address (RCW 63.14.154). Bidding or working as an unregistered contractor is both a gross misdemeanor (RCW 18.27.020) and an infraction (RCW 18.27.200). OUR READING: a landscaping contract you sign at home after an uninvited visit is likely covered by the FTC’s three-day rule; get scope, plant list, dates, total price, payment stages, warranty, and cancellation terms in writing, pay by stages, and ask for lien releases from suppliers and subcontractors as you pay.
11. Who hauls away the clippings, sod, soil, rock, and stumps — and what can go in my Seattle yard waste cart?
Why it matters: SPU says food and yard waste (compost) service has been required for every household of one to four units since 2012, and that leaves, grass, and plant trimmings are not allowed in the garbage (SPU: Food & yard); Seattle Municipal Code sections 21.36.082 and 21.36.083 require that residents and businesses not put food scraps, compostable paper, yard waste, and recyclables in their garbage (SPU: Food waste requirements). SPU’s sorting guide lists yard waste, plants, and clean wood — branches, leaves, and unpainted wood — as compost items (SPU: How to sort at home). Extra yard waste can be set out next to the cart on collection day, charged by the unit: a 32-gallon can, a large kraft paper bag or approved compostable bag, or a bundle tied with fiber twine up to 4 feet long and 2 feet in diameter, with no food waste mixed in (SPU: Setting out waste for collection). OUR READING: we found no SPU page telling homeowners how to dispose of sod, soil, rock, concrete, or stumps from a landscaping job, so put haul-off and disposal in the contract, name who pays for disposal, and use your own cart and extra yard waste set-outs only for properly prepared trimmings.
Red flags
- Can’t give an L&I registration number and specialty that match the company name on the contract, insurance, and advertising, or the registration shows as expired or suspended.
- Bids planting, irrigation, walls, decks, or a boundary fence but can’t say which registered specialty covers each piece.
- Won’t give you the written disclosure statement before work starts, or can’t name the bond on file.
- Connects a sprinkler system to your water with no named backflow assembly, no state-certified tester, and no plan to send the report to Seattle Public Utilities.
- Wires a lighting transformer, pump, or pond or fountain lights without an electrician.
- Can’t show a workers’ comp account in L&I Verify or says a 1099 form covers the crew.
- Sprays weeds, moss, or insects but isn’t on WSDA’s license search, or has employees applying with no operator licenses.
- Offers to remove a tree, top it, or cut big limbs or roots with no registered tree service provider, no tier or permit number, or no SDOT permit for a planting-strip tree.
- Builds a wall near the property line, a taller fence, a raised deck, or a large patio with no permit answer, or starts with no 811 ticket and no plan for private lines.
- Knocks on your door, pushes you to sign today, wants cash only or a large deposit, won’t give a written contract with cancellation terms or lien releases, or plans to leave sod, soil, rock, or stumps for you to dispose of.
Next-step checklist
- Look up the contractor in L&I Verify by name, license number, or workers’ comp account, and confirm the registration is active, the specialty fits, and the name matches the contract and insurance.
- Ask for the written disclosure statement and a copy of the bond and liability insurance certificate before work starts.
- For a sprinkler or lighting job, get the installer’s name, the permit authority and permit number, the backflow assembly type and model, and who will test it and report to SPU.
- Confirm that any line-voltage hookup, pump, or pond or fountain lighting is done by a licensed electrician.
- Check any pesticide applicator on WSDA’s license search and ask for the nursery endorsement if plants are installed.
- For trees, find the tier of each tree, the registered tree service provider on SDCI’s directory, and any SDCI approval or SDOT street tree permit.
- Check your lot for environmentally critical areas and property-line issues, and confirm permits for walls, fences, decks, grading, and large hard surfaces.
- Get the Washington 811 ticket number before any digging, and mark or locate private sprinkler, lighting, and gas lines.
- Check your HOA’s rules on drought-resistant landscaping and get any approval in writing.
- Put scope, plant list, dates, price, payment stages, warranty, cancellation terms, and haul-off in the contract; pay by stages and ask for lien releases as you pay.
Sources